Construction of Al-Atshan
concrete bridge in Al-Simaweh governorate in 2003 to the
beneficiary of MOH.
-
Construction of Al-Saydeya
firehouse in Baghdad by the engineers of MEE. These
projects are still active and are in their final levels.
The contract started in Feb. 2005 while in the meantime
we were constructing Al-Amil and Al-Jehad firehouses .
-
installation and administrating the communication system
of CPA-SC through Space Link and GSCS
companies from 2003-2005.
-
Renovating Al-Bayaa
firehouse overseen by our engineers in 2004
-
Construction of Hilla
Police Academy in Babylon province in 2004.
-
Supervision on Al-l’alam
Health Clinic in Baghdad in 2005.
-
Construction of Hillah
Democracy Center in Babylon in 2005.
-
Construction of 600-men
camp in IZ for DynCorp Co. in 2005.
-
Construction of a new
embassy DAFC in the IZ for US embassy (prefabricated
building) in 2005.
-
Installation and managing the communication system of
the Iraqi Government building (GOIC) from
2005-2006 through Space Link and GSCS
-
Construction of a 100-man
camp for GBC Co. in 2005 in the IZ.
-
Construction of a new
medical clinic in old AL-Muthana Air field, Baghdad. The
client was National Buildings Co.
-
Al Mahmoudyah Hospital Beatification / Mahmoudyah /
Baghdad / 2006/ contracting officer Charles W. Claypool
strikeprojects@yahoo.com . the job was completed and
turned over perfectly to the client.
-
Al Sadr City Water Network / contracts no.
W917BG-06-C-0205 & W917BG-06-C-0215. cost of the two
projects is $3,420,000 / Client USACE. Contracting
officer Robert R. Egan . the two
projects are under construction .
-
Al Adhamiyah Petrol Station Renovation #123 QC
Manager/Supervisor: Eng. Arshad A.Mohammad .
-
MAHALA 965 SEWER MAIN FROM PS SE1 TO PS SE2 AND
CONSTRUCT PS SE2, LOCATED IN KARADAH DISTRICT OF
ZAFRANIYAH QC Manager/Supervisor: Eng.Arshad A.Mohammad
.
-
Design and contstruct of overhead protection
W91GY0-08-C-0028 for J4, Barn and Village in the
Phoenix base. We completed the design of bearing walls,
steel structors updated all requirements.
-
Construct and expredit a police station in masafee.
W19DGW-08-C-4020 We leveled the site with compaction,
supplied T-walls as P.S. parameters, installed gates,
fabricated and installed two trailers as offices,
supplied two Generators with wiring to provide fully
workable electricity to the site, fabricated and
supplied 6 metal Toilets, fabricated 180m2 tent as a
living area and connected the site to the national
electricity grid system. Project was done efficiently
and turned over to the client.
-
constructing expedient Police Station in Arab Jbour
W91GY0-08-M-0225 The project included constructing and
plastering, fixing the cracks in the walls and ceiling,
laying paving tiles, change the doors and windows,
design and construct water closets, roofing, design the
suitable connection installing the adequate HVAC system,
replacement of the entire sewer system with new pipes,
fittings and connecting the building to the main street
sewer network.
-
Kirkush Lift Station Power W91GY0-09-P-0018 Run 250 m
overhead cable and associated hardware. Provide and
install all required cable connectors and associated
parts. The job was completed and turned over perfectly
to the client.
-
W91GY0-09-P-0033 Kirkush elevation tank Construct water
tank platforms and systems to elevate approximately 68
water tanks. System shall tie into the current water
lines to fill the tanks and include effluent booster
pumps to pressurize water.
The project is still under construction. the overall
finished percentage is 25%.
-
Construction of a
12-story building in Lebanon in 2002.
-
W91GY0-09-P-120 KMTB CIVIL REPAIRS. This project
included construction of roads and parking with cut and
fill works, sub-base and crushed gravel grading and
compaction. including design and construction in
Kirkush Military Base. Diala .
-
W91GY0-08-M-0294 Construction of Expedient Police
Station in Al Furat Police College. Baghdad – Al Furat
District.
-
W91GY0-08-M-0345 Supply and Installation of 18000 BTU AC
units to Al Taji Military Base.
-
W91GY0-08-M-0353 Supply and Installation of Speed Pumps
in Phoenix Base. Baghdad - International Zone.
Networking :
-
Implementing Abu Ajaj
village’s water network as well as 10KM road pavement in
one contract in 2004; for the beneficiary of the
Department of Water in Hilla.
-
Implementation of Al-Sowaib
sewage system in Baghdad for the beneficiary of Amanat
Baghdad. The project started in 2004 and finished in
2005 in perfect results.
-
Implementation of fiber
cable laying, from Musayab to Mahaweel in Hilla, in 2003
to the beneficiary of MOC.
-
Implementation of Riadh
Al-Sulh sewage network and road pavement in Lebanon/
Beirut in 2002 in contract with Nasser Co.
1. Building and
construction:
|
ATTACHMENT B - CONSTRUCTION EXPERIENCE REFERENCE
SHEET |
|
List
work which best illustrates current qualifications
relevant to this award. List no more than five (5)
CONSTRUCTION contracts from the last two to three
years. Each contract listed on this sheet shall have
a completed OFFEROR QUESTIONAIRE (ATTACHMENT A)
provided. Failure to furnish complete
information on all sheets may result in the
Government’s rejection of your proposal. Mark either
Prime,
Sub, or Joint Venture. Explain all projects provided
on this sheet on the OFFEROR QUESTIONAIRE
(ATTACHMENT A). |
Contract Name/Client,
Location of
Services |
Prime Sub
Joint |
Prime Sub
Joint |
Prime Sub
Joint |
Total Contract
$ Amount |
Offeror’s Share of
Responsibility
for Total
Contract |
Mahalla 601 potable
water network
replacement /
Almansoor district -
baghdad |
x |
|
|
$ 1,589,341 |
$ 1,589,341 |
Sadr city potable
water network
replacement sectors
5,4,2 and
1/ sadr city -Baghdad |
x |
|
|
$ 1,683,448 |
$ 1,683,448 |
Sadr city potable
water network
34,36,37and 44/ sadr
city -Baghdad |
x |
|
|
$ 1,764,536 |
$ 1,764,536 |
Mahmoudiyah local
council |
x |
|
|
$62,779 |
$62,779 |
Mahmoudiyah
beautification hospital |
x |
|
|
$ 128,225 |
$ 128,225 |
AL-ADHAMIYAH
PETROL
STATION
RENOVATION (NO.
123) |
x |
|
|
$ 145,424 |
$ 145,424 |
Kirkush lift station
power |
x |
|
|
$ 111,200.00 |
$ 111,200.00 |
Kirkush water
elevation tank |
x |
|
|
$ 429,700.00 |
$ 111,200.00 |
|
KMTB CIVIL REPAIRS - 2008 |
x |
|
|
|
770,500 |
|
KMTB ELECTRICA REAIRS - 2009 |
x |
|
|
|
84,200 |
|
Phoenix Base Overhead
Protection - 2009 |
x |
|
|
|
831,000 |
2. M601 Water Network
project
- Client: USACE .
- Performance: 180 days .
- Contract amount: $1,589,341 .
- Description: Construction of a new UPVC
water network of about 21 KM, in Baghdad
province .
*** MEE has executed
one of the best water networks in Baghdad with
supervision of Amanat Baghdad.
The network passed all the tests required,
successfully, and was completed safe equipped and
performed
- Client: USACE
- Performance: 30 days
- Contract Amount: $60,000
- Description: Rehabilitation of Al-Mahmoodyah
Local Council in Baghdad provinc
*** This project reflects our ability in
correcting wrong-based jobs and providing long-term
quality insurance, only done by
MEE .
3.
Rehabilitation of Al-Mahmoodyah Local Council
|