EPCC OF Export Pipeline for Garraf Contract Area


Client: Petronas Caligari Iraq Holding B.V.

End User: Iraqi South Oil Company / Ministry of Oil.

Project Descreption

The project is EPCC of the export pipeline for Garraf Contract Area to export the crude oil from the FCP at Garraf to Ahdep Pipeline which exports the crude oil further to the government depot at Nasseryah city.

 

The project consists of 8km of 18" pipeline with the related facilities such as fiberoptic, leak detection system, launching and recieving stations, 2 block valve stations and the required tie-ins.

The project consists as well around 500m river crossing

by HDD method. MEE has provided the HDD machine first time to the Iraq market and provided the experts required to perform the job and train the Iraqi experts on this technology.

MEE has performed the engineering phase in its engineering offices in UAE and sourced reliable vendors worldwide through its office in UAE and USA to ensure an optimum performance for the project.

Construction has started in Dec. 2011 and MEE has obtained the Mechanical Completion Certificate on May 2013.