W91GY0-09-C-0219


- Contract was with USACE / GRC.

- End User Iraqi Ministry of Defence.

- Project Period was 120 days.

     

MEE was awarded this project in 2009 as EPCC the project is for design and construct a Vynil structure maintenance facility with a total area of 372 sq.m and 7m peak height. MEE performed the structural, HVAC, Electrical and lighting design and provided Clamshell brand structure based on MEE design. the project included lighting, dors, windows, roll up doors, HVAC system, electrical distribution system and electrical connections to the sources.

The project was completed at time and turned over to the client with high satisfaction.