W917BG-07-C-0205 / 0215


 

-        contract with USACE and the end user ( owner ) is Baghdad municipality.
-        The project started in late 2006 and completed in October 2007.
 
   
 
 
these two projects were awarded at the same time in 2007. Each of them to Engineer, procurement, Construction and Commissioning of Water networks in 4 sectors of Sadr city. The total lengths of the 8 sectors network was 64.2 KM varies from 6-8” UPVC pipes. MEE has received the FEED from the Baghdad municipality and developed the detailed design. the project was performed under the very bad security situation in Iraq and could complete, test & commission and turn over the project to the client successfully.



Back
 

Home Page || About us || Services || Projects || Partners || Careers || Work Team || Contact us || Report || Client

All rights reserved to Middle east engineering © 2019