W91GY0-09-C-0029


 

-        Contract was with USAF. And the end user (owner ) is the Iraqi Ministry of Defense.
-        Total project cost $9,823,200.
-        Project was started on Dec-2009 and it is under construction. 75% completed.
 
  
 
 
This project is a EPCC project. MEE has performed the required engineering and dealt with several manufacturers and suppliers including Turkey, UAE, KSA, Italy, Kuwait, USA and china through our procurement division and have successfully supplied all equipments and materials required for the entire project. the scope id to design and construct several K span buildings, CMU buildings, Sewer and potable water lines, Electricty generation and distribution, Site lighting, warehouses and maintenance shops, roads construction, storm water management, guard towers, Fences and Entry Control Points with high level security threats. The job included all telecommunications and networking required for functional command.. MEE used 6 local sub-contractors to perform the construction under MEE’s management and the project is almost 75% complete with high satisfaction to the client.
 
Some of the pictures after completed the project  :-
 
 
 
 
 
 
 
 
 
 
 
 


Back
 

Home Page || About us || Services || Projects || Partners || Careers || Work Team || Contact us || Report || Client

All rights reserved to Middle east engineering © 2019