W91GY0-09-C-0026


 

 

-        Contract was with USAF and administrated by USACE and the end user ( Owner was Ministry of Defense / Iraqi Airforce)
-        The project started in Nov 2009 and it is under construction. 75% completed.
 
   
 
This project was awarded to MEE as EPCC project. MEE has performed the 100% design and was approved by the client. And communicated with suppliers and manufacturers from Turkey, KSA, Egypt, Germany, Italy, USA, China, Canada to supply the required equipments and materials. the project included design, fabrication, erection and construction of 4 of 245,000 liters JP8 tanks, 2 offloading systems, 3 loading systems, all piping from 2 inches up to 8 inches, instrumentation, cathodic protection, telecommunication, control panels and PLC, operation building, electricity generation and distribution system, sewer and water systems and tie-ins, concrete roads and parking, parking shades and fueling / refueling canopies, spill containment system, geotextile and geomembrane works, concrete dikes for the tanks, fencing and gate, fire fighting system and lighting system. MEE has almost completed 75% of the project with high satisfaction to the client.
 
 
 
Some of the pictures after completed the project  :-
 
 
 

 

 
 
 
 
 
 
 
 
 

 

 